Design the geotechnical investigation, and conduct the geotechnical study, to identify the causes of severe pavement problems (intense waving, etc.) of a motorway on a embankment, having maximum height 9m and being 1800m long. Proposition of remedial measures.
Client: REGION OF THESSALY